2021 – Supply 2×7500 m3/day new desalination plant at KHPP2021

  • Project location: AlKhums
  • AL MUT Quoted for this Project on April 2022
  • Wait for GECOL PO to Start the Project.
  • See PIC 

KH Supply and Install 2 MED Multiple Effect Distill Technology Desal Units

STEAM BOILER TWO PACKAGES

Installation of Two (2) Steam boiler PKM-64-80 and Auxiliaries

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>